This expansion and upgrade of a working data center in midtown Sacramento consisted of two phases.  The first was a major structural upgrade of the building roof to support Phase 2 cooling and electrical equipment.  In addition to the added cooling capacity, Phase 2 included the installation of a new transformer and a 1500kw emergency generator with switchgear.  A new large battery back-up system was also part of the Phase 2 work.