Red Hawk Casino Parking Structure

Unger Construction completed the Red Hawk Casino Parking Structure for the Foothill Oaks Casino (Shingle Spring Band of Miwok Indians) in a 14 month time frame.  The scope of work included forming and pouring all structural cast-in-place concrete, consisting of  foundations, slab on grade, upturn and downturn moment beams, topping slabs and stair treads and pans. 

Project Facts:

  • Total Square Footage:                        1,300,000
  • Parking Levels:                                     8
  • Square Footage Per Level:                 163,000
  • Number of Parking Spaces:               3,100
  • Days Required Per Cycle:                   10
  • Days to Complete All Pre-Cast:          95
  • Pieces of Pre-Cast:                               2,600
  • Total Yards Concrete Poured:            20,900